Cost and capacity become part of engineering decisions
The factory records run cost, capacity and delay so work can be routed to suitable models and stopped when value is weak.
Depends on: E2-M1, E3-M1
Epic E4
The factory can reason about cost, capacity, quality and its own improvement opportunities.
Engineering choices include the price of model calls, verification effort, delay and maintenance burden.
Proposed. The brief makes cost and resource allocation central, but this website does not claim the factory optimises itself today.
The factory records run cost, capacity and delay so work can be routed to suitable models and stopped when value is weak.
Depends on: E2-M1, E3-M1
Full 20-section assignment preserved locally with SHA256 e8b55ed458e3bc6347735cccee872f59a0bf863b4d1dddb56ba2400b21b2461f.
The city was running under supervisor control with Mayor active. Rigs, formulas, packs, queues and GitHub credentials were inspected with the installed CLI.